Product Info Policies & Delivery Promotions Find a Dealer About Us Contact Us

 

> Home > Policies & Delivery

Ordering Returns/Credits Order Cancellations Installation Guides Warranty Delivery Technical Info Template Signature Formica Stone Terms Accounts Payable

 

Quick Links 


Customer Survey
We need your feedback. Take our Simple Survey Today!
Product Info
Adrich Fabrication Center product pages. All questions about countertops can be answered here.

 

 

Installation Guides

 

 

 

Installation of Countertops

After scribing countertops to fit the walls, lay out the pieces of top to be assembled. Glue one edge of the mitre using sufficient glue to squeeze out of the joint when assembled. Starting from the front of the mitre, line top and tighten 1st bolt slightly. Move on the 2nd., 3rd. and 4th bolts as you even the surface of the top

1.) With top well supported use a block of wood and a hammer to finish aligning the top surface.



2.) Finish tightening up the mitre bolts.



3. Draw backslash together using 1-6 penny box nail driven in from each side of the counter.

 


4.) Clean excess glue from the top by using a damp cloth.

 


5.) Select proper color Kampel Seamfil. Clean seam and rub seamfil into the joint.

 


6.) Let dry 2-3 minutes and scrape off excess seamfil with a scrap of Formica. Clean seam with seamfil solvent or lacquer thinner.

 


7.) Repeat process where extra seamfil is needed.

 


8.) When installing sinks into Formica tops be sure to radius all corners and in all sinks with proper caulking compound.

 

 

Return To Top

 

 

 

 

 

Aldrich Fabrication Center • Copyright 2005 • 800-225-4664